Some NIOSH, OSHA or other sampling methods require the use of 2 sorbent tubes in series. This video provides the precise information necessary to put the sampling train together in preparation for calibration with the field rotameter. It includes instruction on proper directional alignment of the tubes, the constant pressure controller and the adjustable low flow holder.
