Pump Calibration Sorbent Tube Two in Series

Some NIOSH, OSHA or other sampling methods require the use of 2 sorbent tubes in series. This video provides the precise information necessary to put the sampling train together in preparation for calibration with the field rotameter. It includes instruction on proper directional alignment of the tubes, the constant pressure controller and the adjustable low flow holder.

Categories: Industrial Hygiene
Tags: Instructional, Sampling Guides
This entry was posted in , . Bookmark the permalink.